Executive Summary
   
  Chapter 1
Introduction
   
  Chapter 2
Project Description
General
Status of Project
Justification of the Project
Process Details
Steam Power Cycle
Water Condensate
Grid Interface
Raw Material
Product & By product
Water System
Water Requirement
Provision for Pollution Control
Project Implementation
Power Requirement
Waste Water Generation
Spilage, leakage
Boiler Blow Down
Characteristics of waste Water
Effluent Treatment Plant
Effluent Treatment Process
Specification of ETP Plant
Gaseous Emmission
Solid Waste and its Disposal
Noise (Source & Control)
   
  Chapter 3
Environmental Setting of Site
Physical Environment
Aesthetic Environment
Existing Secenario of Co-generation Power Plant
   
  Chapter 4
Environment Impact Prediction
Impact During Construction Phase
Impact during Operation Phase
Impact on Socio-Economic Environment
   
  Chapter 5
Environment Impact Analysis
Matrix Method
Check List Method
Expert Advice
Economic Technique
   
  Chapter 6
Environment Management Plan
Air Pollution Control
Noise Pollution Control
Command Area Development
Monitoring System
Monitoring Facility
   
   
  Annexures
List of Machinery
Study Area
Plot Plan  
Ambient Air Quality Monitored at MPCL  
Meteoroloical Data at MPCL  
Noise Level Monitored Monitored at MPCL  
Ground Water Quality Monitored within Buffer Zone  
Surface Water Quality Monitored Within Buffer Zone  

 Land Use Pattern Within Buffer Zone

 

Soil Quality Monitored Within Buffer Zone

 

Cropping Pattern Within Buffer Zone

 

Demographic Structure Within Buffer Zone

 

Occupational Structure Within Buffer Zone

 

Post Telegraph and Communication Facilities Within Buffer Zone

 

Educational Facilities Within Buffer Zone

 

Health Care Facilities Within Buffer Zone

 

Drinking Water Facilities Within Buffer Zone

 

Flow Diagram of Sugar ETP

 

Annexure D (Contd..)
Ambient Air Quality Monitored At Mahagaon

 

 

 

 

Sample No. Date of Monitoring 24 Hour Average Concentration in jig/m3 of
   

SPM

SO2

NOx

         

1

01.10.2003

103.8

3.6

12.0

2

04.10.2003

102.6

4.6

10.0

3

07.10.2003

122.3

4.6

10.8

4

10.10.2003

124.6

6.6

12.3

5

13.10.2003

106.0

4.4

12.8

6

16.10.2003

61.3

2.8

8.8

7

19.10.2003

80.3

4.8

6.2

8

22.10.2003

123.3

8.2

13.6

9

02.11.2003

04.1

8.4

12.4

10

05.11.2003

66.6

3.8

6.8

11

08.11.2003

133.6

3.6

8.0

12

11.05.2003

80.2

4.2

12.8

13

14.11.2003

62.0

8.6

10.6

14

17.11.2003

88.6

8.4

12.6

15

20.11.2003

60.3

8.6

12.3

16

23.11.2003

66.4

8.2

13.1

17

03.12.2003

63.6

4.6

12.6

18

06.12.2003

66.3

3.8

12.8

19

09.12.2003

103.1

8.3

10.3

20

12.12.2003

186.3

8.3

10.3

21

15.12.2003

86.6

4.6

13.8

22

18.12.2003

83.8

3.0

10.6

23

21.12.2003

120.0  

8.3

12.4

24

24.12.2003

66.6

4.8

12.6

       

Maximum
Minimum

98 Percentile

186.3
60.3
162.1

8.6
2.8
8.6

13.6
6.2
13.4

       

 
 