Executive Summary
   
  Chapter 1
Introduction
   
  Chapter 2
Project Description
General
Status of Project
Justification of the Project
Process Details
Steam Power Cycle
Water Condensate
Grid Interface
Raw Material
Product & By product
Water System
Water Requirement
Provision for Pollution Control
Project Implementation
Power Requirement
Waste Water Generation
Spilage, leakage
Boiler Blow Down
Characteristics of waste Water
Effluent Treatment Plant
Effluent Treatment Process
Specification of ETP Plant
Gaseous Emmission
Solid Waste and its Disposal
Noise (Source & Control)
   
  Chapter 3
Environmental Setting of Site
Physical Environment
Aesthetic Environment
Existing Secenario of Co-generation Power Plant
   
  Chapter 4
Environment Impact Prediction
Impact During Construction Phase
Impact during Operation Phase
Impact on Socio-Economic Environment
   
  Chapter 5
Environment Impact Analysis
Matrix Method
Check List Method
Expert Advice
Economic Technique
   
  Chapter 6
Environment Management Plan
Air Pollution Control
Noise Pollution Control
Command Area Development
Monitoring System
Monitoring Facility
   
   
  Annexures
List of Machinery
Study Area
Plot Plan  
Ambient Air Quality Monitored at MPCL  
Meteoroloical Data at MPCL  
Noise Level Monitored Monitored at MPCL  
Ground Water Quality Monitored within Buffer Zone  
Surface Water Quality Monitored Within Buffer Zone  

 Land Use Pattern Within Buffer Zone

 

Soil Quality Monitored Within Buffer Zone

 

Cropping Pattern Within Buffer Zone

 

Demographic Structure Within Buffer Zone

 

Occupational Structure Within Buffer Zone

 

Post Telegraph and Communication Facilities Within Buffer Zone

 

Educational Facilities Within Buffer Zone

 

Health Care Facilities Within Buffer Zone

 

Drinking Water Facilities Within Buffer Zone

 

Flow Diagram of Sugar ETP

 

6.4      MONITORING SYSTEM

6.4.1   Formation of Environmental Management Cell (EMC)

Monitoring and feedback becomes essential to ensure that the mitigation measures planned by way of environmental protection function efficiently, during the entire period of (GAIL) operation. Hence, an environmental manacement cell
comprising senior officials may be constituted. Organisational set-up of EMC may be as presented in Figure-1

EMC will perform following functions:                                                    

  1. Monthly review of environmental problems and monitoring of installation /
    performance / maintenance of pollution control measures.
  2. Enforcement of latest rules and regulations under relevant Environmental
    protection Acts. 
  3. Preparation of budgetary estimates to seek sanctions for new pollution control
    measures if required and  / or for up-gradation of existing ones based on new
    technologies
  4. Emergency planning

EMC shall meet at least once a month and take stock of progress of work relating to decisions taken and targets set in the previous meeting.

6.4.2 Formation of Task Force

A task force having organisational set-up as presented in m Figure J comprising (CAIL) staff of Various grades shall be constituted. The task force will ensure following tasks:   

  • Monitoring activities within core and buffer zone of (CAIL) as per program given in 6.4.3
  • Monitoring of efficiency of pollution control schemes.                                        
  • Preparation  of maintenances  schedule of pollution  control equipment and
    treatment plants and see that it is followed strictly.                                                     
  • Inspection and regular cleaning of setting tanks, drainage system etc.                         
  • Green-belt development
  • Water and energy conservation                                                                     
  • Good housekeeping    
  • Appraising EMC on regular basis
 
 