Executive Summary
   
  Chapter 1
Introduction
   
  Chapter 2
Project Description
General
Status of Project
Justification of the Project
Process Details
Steam Power Cycle
Water Condensate
Grid Interface
Raw Material
Product & By product
Water System
Water Requirement
Provision for Pollution Control
Project Implementation
Power Requirement
Waste Water Generation
Spilage, leakage
Boiler Blow Down
Characteristics of waste Water
Effluent Treatment Plant
Effluent Treatment Process
Specification of ETP Plant
Gaseous Emmission
Solid Waste and its Disposal
Noise (Source & Control)
   
  Chapter 3
Environmental Setting of Site
Physical Environment
Aesthetic Environment
Existing Secenario of Co-generation Power Plant
   
  Chapter 4
Environment Impact Prediction
Impact During Construction Phase
Impact during Operation Phase
Impact on Socio-Economic Environment
   
  Chapter 5
Environment Impact Analysis
Matrix Method
Check List Method
Expert Advice
Economic Technique
   
  Chapter 6
Environment Management Plan
Air Pollution Control
Noise Pollution Control
Command Area Development
Monitoring System
Monitoring Facility
   
   
  Annexures
List of Machinery
Study Area
Plot Plan  
Ambient Air Quality Monitored at MPCL  
Meteoroloical Data at MPCL  
Noise Level Monitored Monitored at MPCL  
Ground Water Quality Monitored within Buffer Zone  
Surface Water Quality Monitored Within Buffer Zone  

 Land Use Pattern Within Buffer Zone

 

Soil Quality Monitored Within Buffer Zone

 

Cropping Pattern Within Buffer Zone

 

Demographic Structure Within Buffer Zone

 

Occupational Structure Within Buffer Zone

 

Post Telegraph and Communication Facilities Within Buffer Zone

 

Educational Facilities Within Buffer Zone

 

Health Care Facilities Within Buffer Zone

 

Drinking Water Facilities Within Buffer Zone

 

Flow Diagram of Sugar ETP

 

 

Table 5

Environmental Impact Matrix
for the Proposed Co-Generation Plant of (CAIL) During Construction Phase (Contd...)

       

Sr. No.

Environmental Attribute

Environmental Impact Due to (CAIL) Activities

 

       

 

 

I
II

 

         
             

1

Air Quality

-2

7

2

5

 

2

Noise Levels

-2

5

2

3

 

3

Land Use

-

 

2

5

 

4

Soil Chemistry

-1

5

1

5

 

5

Crop Yield

-2

5

1

3

 

6

Occupational Structure

5

7

1

3

 

7

Flora & Fauna

-1

3

2

5

 

8

Social Interactions

3

5

1

3

 

9

Transportation

3

5

1

3

 

10

Economy

3

7

1

3

 

             

   

LEGEND          
             

I

Power Generation

II

Plantation / Landscaping

   

5.2     CHECK LIST METHOD

The  detailed impact analysis and form the curse of the environmental impact assessment one has to use a checklist method for identifying the possible impact during and after the completion of the proposed cogeneration power plant. The check list include modification of regime, land transformation and construction, resource extraction, processing, land alternation, resource renewal, changes in traffic, waste replacement and treatment, chemical treatment and accident has to be assessed. This comprehensive and user friendly checklist is invaluable aid for several activities of EIA, particularly scoping and defining baseline studies. The check list has been prepared for non-specialist and enables much time     consuming work to be carried out in advance of expert input. It includes     extensive data collection sheets. The collected data can then be used to answer a series of questions to identify major impacts and identify shortage of data. The result sheet from the checklist is reproduces in the following table 4.

 
 

                                             Copyright CAIL - 2007                                                                                      Site Designed & Developed by Purple Haze Multimedia